- 15,000 SF of floor tile removal
- 25,000 SF of drop ceiling removal
- Overhead obsolete MEP removal throughout
- 30,000 SF of interior wall removal
William Blount High School Renovation
Location
Knoxville, TN
- Cut in new elevator shaft through 1st floor slab, 2nd floor elevated slab, and roof
- Wall sawing for new openings
- Millwork and fixture removal throughout