• 15,000 SF of floor tile removal
  • 25,000 SF of drop ceiling removal
  • Overhead obsolete MEP removal throughout
  • 30,000 SF of interior wall removal
  • Cut in new elevator shaft through 1st floor slab, 2nd floor elevated slab, and roof
  • Wall sawing for new openings
  • Millwork and fixture removal throughout