- 10,750 SF of plaster wall removal on interior face of exterior brick wall
- 18,500 SF of floor strip and ceiling removal
- 21,500 SF of interior wall demolition
- ICRA Containments
- Asbestos Removal AC pipe insulation
- Duct mastic
- 18,000 SF of ACT and black mastic
VA Hospital Renovation
Location
Murfreesboro, TN
- Window removal
- Exterior wall cut-ins for buck hoist and trash chutes
- Removal of all millwork and appliances
- OSHA 10 Workforce
- OSHA 30 Supervisor
- Prevailing wage with certified payroll
- Selective MEP removal on 3rd floors active hospital floor