• 10,750 SF of plaster wall removal on interior face of exterior brick wall
  • 18,500 SF of floor strip and ceiling removal
  • 21,500 SF of interior wall demolition
  • ICRA Containments
    • Asbestos Removal AC pipe insulation
    • Duct mastic
    • 18,000 SF of ACT and black mastic
  • Window removal
  • Exterior wall cut-ins for buck hoist and trash chutes
  • Removal of all millwork and appliances
  • OSHA 10 Workforce
  • OSHA 30 Supervisor
  • Prevailing wage with certified payroll
  • Selective MEP removal on 3rd floors active hospital floor