• Multi phased renovation of active hospital
  • 2,000 SF of roof parapet removal
  • 19,500 SF of roof membrane removal
  • Structural steel removal at elevator and stair shafts
  • Penthouse structural member and facade removal
  • Hospital kitchen gut, including tile/mud bed flooring, ceiling finish, appliances & equipment, and MEP dropping.
  • Slab scanning and concrete removal for new utilities
  • 5,000 SF of interior wall removal
  • Exterior wall removal and facade strip
  • Window and knee wall removal