- 2,000 SF of non-load bearing CMU walls
- 500 SF of load bearing CMU wall removal, including shoring
- New CMU wall openings, including saw cutting and shoring
- Interior wall and ceiling finish removal throughout
- All casework & millwork removed throughout
West End Church
Location
Columbia, TN
- 8,000 SF of ACM flooring and mastic removal
- 2,500 SF of ACM ceiling tile removal
- Final air clearance
- Overhead MEP dropping and disposal
- Exterior mechanical equipment removal
- New exterior wall openings