Alex Green Elementary School

Nashville, TN

Project Details

  • Exterior door & frame removal
  • Brick veneer removal at entrance
  • Floor finish removal 200 SF
  • Interior CMU wall Removal 
  • Millwork and shelving removal
  • Interior slab removal
  • Concrete ceiling removal over vault

Video preview

Alex Green Elementary School

Go back home

  • Exterior door & frame removal
  • Brick veneer removal at entrance
  • Floor finish removal 200 SF
  • Interior CMU wall Removal 
  • Millwork and shelving removal
  • Interior slab removal
  • Concrete ceiling removal over vault