• Complete gut of 80,000 SF academic building
  • Elevated slab removal for new (3) story atrium
  • Elevator shaft & vestibule removal
  • Terracotta & plaster interior wall removal throughout
  • Rooftop mechanical equipment rigging & removal
  • Provided engineered structural plans for load bearing exterior wall removalĀ 
  • All utility disconnects and make safes provided by FIVESTAR
  • Electrical equipment salvage
  • 7,500 SF of marble wainscotting salvage and storage
  • Interior four story concrete/steel stairwell removal (x2)