- Complete gut of 80,000 SF academic building
- Elevated slab removal for new (3) story atrium
- Elevator shaft & vestibule removal
- Terracotta & plaster interior wall removal throughout
- Rooftop mechanical equipment rigging & removal
- Provided engineered structural plans for load bearing exterior wall removalĀ
- All utility disconnects and make safes provided by FIVESTAR
- Electrical equipment salvage
- 7,500 SF of marble wainscotting salvage and storage
- Interior four story concrete/steel stairwell removal (x2)