West End Church

Columbia, TN

Project Details

WORK ACCOMPLISHED

  • 2,000 SF of non-load bearing CMU walls
  • 500 SF of load bearing CMU wall removal, including shoring
  • New CMU wall openings, including saw cutting and shoring
  • Interior wall and ceiling finish removal throughout
  • All casework & millwork removed throughout
  • 8,000 SF of ACM flooring and mastic removal
  • 2,500 SF of ACM ceiling tile removal
  • Final air clearance
  • Overhead MEP dropping and disposal
  • Exterior mechanical equipment removal
  • New exterior wall openings

Video preview

West End Church

Go back home

WORK ACCOMPLISHED

  • 2,000 SF of non-load bearing CMU walls
  • 500 SF of load bearing CMU wall removal, including shoring
  • New CMU wall openings, including saw cutting and shoring
  • Interior wall and ceiling finish removal throughout
  • All casework & millwork removed throughout
  • 8,000 SF of ACM flooring and mastic removal
  • 2,500 SF of ACM ceiling tile removal
  • Final air clearance
  • Overhead MEP dropping and disposal
  • Exterior mechanical equipment removal
  • New exterior wall openings